期刊文献+

大庆油田轻烃管网调度优化 被引量:2

Optimal scheduling of light hydrocarbon pipe network in Daqing Oilfield
原文传递
导出
摘要 为解决目前大庆轻烃管网间歇输送模式下频繁启停泵等问题,考虑站场外输模式、水力、站内罐容与节点分输流量等约束条件,基于定时步法,建立了在研究时间段内以输烃站场启泵次数最少为目标函数的轻烃管网调度优化模型。考虑到模型约束条件具有非连续性且模型规模庞大,引入相对罐容、连续参数、外输优先级等过渡变量,采用优先级算法对模型进行求解,并且通过改变连续参数来调整外输操作的连续性和紧迫性对外输优先级影响的比重,选择最优方案。同时,为了避免重复计算,预先求出满足约束条件的所有可能的启泵方案,整理成启泵方案列表,供模型求解时进行查找,提高了求解速度。所得方案与传统调度方式相比,启泵次数减少近45%,可以为现场优化输送调度提供指导。 Considering the fact that pumps frequently starts and stops under the intermittent transport mode of light hydrocarbon pipe network in Daqing Oilfield, an optimal scheduling model of light hydrocarbon pipe network is established with the timing synchronization method. The model considers the constraints including transport mode, hydraulic power, tank capacity within pump station and offtake flowrate at nodes, with the minimum pump-starting frequency in hydrocarbon pump stations within the study time period as objective function. Since the constraints are non-continuous and this model is huge in scale, some transition variables like relative tank capacity, continuous parameters and transport priority are introduced. Priority algorithm is adopted to solve the model, and the continuous parameters are changed to adjust the proportion that continuity and urgency of transport affect priority, to determine the optimal scheme. Meanwhile, to avoid repetitive computation, all possible pump-starting schemes meeting the constraint conditions are solved in advance and collected into a list for reference, by which the model can be solved more quickly. The proposed scheme, with pump-starting frequency nearly 45% less than traditional scheduling schemes, can provide guidance for optimization of field schedule.
出处 《油气储运》 CAS 北大核心 2015年第11期1165-1170,共6页 Oil & Gas Storage and Transportation
基金 国家自然科学基金项目"含蜡原油管道停输过程中的管内复杂自然对流换热机理研究" 51276198
关键词 轻烃管网 调度优化 定时步法 相对罐容 连续参数 外输优先级 light hydrocarbon pipe network, optimal scheduling, timing synchronization method, relative tank capacity,continuous parameters, transport priority
  • 相关文献

参考文献18

  • 1DIXON S L, HALL C A. Fluid mechanics and thermodynamics of turbomachinery[M]. Amsterdam: Elsevier, 2010.
  • 2GIRDHAR P, MONIZ O, MACKAY S. Practical centrifugal pump: design, operation and maintenance[M]. Amsterdam: Elsevier, 2005.
  • 3张海潮,韩建强,李兴涛,段士龙,张黎,陈泳何.鲁尔泵运行中典型故障分析与处理方法[J].油气储运,2013,32(4):406-410. 被引量:3
  • 4REJOWSKI R JR, PINTO J M. Scheduling of a multiproduct pipeline system~J]. Computers and Chemical Engineering, 2003, 27 (8-9): 1229-1246.
  • 5SHAH N. Mathematical programming techniques for crude oil scheduling[J~. Computers and Chemical Engineering, 1996, 20 ($2): 1227.
  • 6KIM T, JIM E P. Implementation of an automated scheduling system on a products pipeline[C]. Calgary: 2th International Pipeline Conference, 2006.
  • 7梁永图,鲁岑,方涛.成品油管道运行调度研究综述[J].石油天然气学报,2010,32(5):355-359. 被引量:14
  • 8杨筱蘅.输油管道设计与管理[M].东营:中国石油大学出版社,2011.
  • 9SASIKUMAR M, PRAKASH P R, PATIL S M, et al. Pipes a heuristic search model for pipeline schedule generation[J~ Knowledge-Based System, 1997 ( 10): 169.
  • 10DIEGO C C, JAIME C. Optimal scheduling of multiproduct pipeline systems using a non-discrete MLIP formulation[J]. Computers and Chemical Engineering, 2004, 28 ( 10 ) ." 2053-2068.

二级参考文献58

  • 1周勇,廖凤,庞炳生.石化离心泵的故障分析及维护[J].化学工程与装备,2008(12). 被引量:2
  • 2金宏,王宏安,王强,戴国忠.改进的最小空闲时间优先调度算法[J].软件学报,2004,15(8):1116-1123. 被引量:25
  • 3卢军民,刘照,荀杰.离心泵常见故障的诊断[J].煤矿机械,2007,28(6):180-182. 被引量:11
  • 4Moro L F L, Pinto J M. A mixed integer programming approach for short term crude oil scheduling [J].Industrial and Engineering Chemistry Research, 2004, 43: 85.
  • 5Rejowski Jr R, Pinto J M. A novel continuous time representation for the scheduling of pipeline systems with pumping yield rate constraints [J].Computers and Chemical Engineering, 2008, 32 (4-5): 1042-1066.
  • 6Christodoulos A Floudas, Xiaoxia Lin. Continuous-time versus discrete-time approaches for scheduling of chemical processes [J].Computers and Chemical Engineering, 2004, 28 (11): 2109-2129.
  • 7Rejowski R Jr, Pinto J M. Scheduling of a muhiproduct pipeline system [J].Computers and Chemical Engineering, 2003, 27 (8-9) : 1229-1246.
  • 8Shah N. Mathematical programming techniques for crude oil scheduling [J]. Computers and Chemical Engineering, 1996, 20: 1227- 1232.
  • 9Yee K L, Shah N. Improving the efficiency of discrete time scheduling formulation[J]. Computers and Chemical Engineering, 1998, 22: 403-410.
  • 10Rejowski R Jr. , Pinto J M. Efficient MILP formulations and valid cuts for multiproduct pipeline scheduling [J] . Computers and Chemical Engineering, 2004, 28 (8) : 1511-1528.

共引文献70

同被引文献18

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部