摘要 广东某污水厂处理规模为30 000 m3/d,原出水水质执行《城镇污水处理厂污染物排放标准》(GB 18918—2002)一级B排放标准。提标改造工程对原有的两组氧化沟进行改造,建设生态生物反应池,强化了碳、氮以及臭气的脱除能力,并具有良好的景观效果。投加聚合氯化铝(PAC)作为化学除磷药剂,实现磷的深度去除。实施提标改造工程后,出水水质稳定达到《地表水环境质量标准》(GB 3838—2002)的Ⅲ类水质标准。 The treatment capacity of a wastewater treatment plant in Guangdong Province was 3 × 10^4 m^3/d. The original effluent quality met the first level B criteria specified in the Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant ( GB 18918 - 2002). The original oxidation ditches were reconstructed into ecological bioreactors to enhance carbon, nitrogen and odor removal during the upgrading and reconstruction project. Po!yaluminum chloride (PAC) was dosed as a chemical for enhanced phosphorus removal. After the upgrading and reconstruction project, the effluent quality stably could meet the m criteria specified in the Environmental Quality Standards for Surface Water (GB 3838 -2002).
出处 《中国给水排水》 CAS CSCD 北大核心 2015年第22期90-94,共5页 China Water & Wastewater
基金 国家水体污染控制与治理科技重大专项(2014ZX07206001-005)
关键词 污水厂 提标改造 生态生物反应池 化学除磷 wastewater treatment plant upgrading and reconstruction ecological bioreactor chemical phosphorus removal
  • 相关文献

参考文献6

  • 1罔家环境保护总局《水和废水监测分析方法》编委会.水和废水监测分析方法(第4版)[M].北京:中国环境科学出版社,2002.
  • 2Seeger E M, Reiche N,Kuschk P,et al. Performance e- valuation using a three compartment mass balance tor the removal of volatile organic compounds in pilot scale con- strutted wetlands [ J ]. Environ Sci Teehnol, 2011 , 45 ( 19 ) :8467 - 8474.
  • 3周振,唐建国,张爱平,邢灿.城镇污水处理厂强化硝化技术现状分析[J].中国给水排水,2013,29(20):5-8. 被引量:13
  • 4Pinney M L,Weslerhoff P K, Baker L. Transforlnations in dissolved organic carbon through constructed wetlands [J]. Water Res,2000,34(6) :1897 -1911.
  • 5Mnch C, Kuschk P, Rske 1. Root stimulated nitrogen re- moval :only a local effect or important for water treatment? [ J ]. Water Sci Techno1,2005,51 ( 9 ) : 185 - 192.
  • 6马君梅,何智龙.污水处理厂污泥减量的案例分析[J].中国给水排水,2014,30(17):116-119. 被引量:6

二级参考文献19

  • 1唐建国,林洁梅.城镇污水处理厂的氮负荷分析[J].给水排水,2005,31(10):31-35. 被引量:3
  • 2赵庆良,赵赫,林佶侃,金文标.剩余污泥减量化技术研究进展与发展趋势[J].给水排水,2005,31(11):106-111. 被引量:26
  • 3赵义,郝晓地,朱景义.侧流富集/主流强化硝化(BABE)升级工艺[J].中国给水排水,2006,22(2):5-8. 被引量:18
  • 4Abeysinghe D H, De Silva D G, Stahl D A, et al. The effectiveness of bioaugmentation in nitrifying systems stressed by a washout condition and cold temperature [ J]. Water Environ Res,2002,74(2) : 187 - 199.
  • 5Head M A, Oleszkiewiez J A. Bioaugmentation for nitri- fication at cold temperatures [ J ]. Water Res, 2004,38 (3) :523 -530.
  • 6Henze M, Gujer W, Mino M, et al. Activated Sludge Models ASM1, ASM2, ASM2d and ASM3 [ M ]. London : IWA Publishing, 2000.
  • 7Kargi F, Uygur A. Nutrient removal performance of a se- quencing batch reactor as a function of the sludge age [ J ]. Enzyme Micro Technol,2002,31 (6) : 842 - 847.
  • 8Gernaey K V, Jcrgensen S B. Benchmarking combined biological phosphorus and nitrogen removal wastewater treatment processes [ J 1- Control Engin Practice,2004, 12(3) :357 -373.
  • 9Salem S,Berends D H,Heijnena J J,et al. Bio-augmen- tation by nitrification with return sludge [ J ]. Water Res, 2003,37 ( 8 ) : 1794 - 1804.
  • 10Rittmann B. How input active biomass affects sludge age and process stability [ J]. J Environ Eng, 1996,122 (1) : 4-8.

共引文献17

同被引文献44

引证文献8

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部