上部结构施工顺序对预应力盖梁受力及配束的影响分析 被引量:1

Analysis on Influence of Construction Sequence of Upper Structure on Stress and Configuration of Prestressed Cap Beam
下载PDF
导出
摘要 结合某快速路工程的大悬臂预应力盖梁结构,分析了上部结构为小箱梁的预应力盖梁在不同的施工步骤下,预应力盖梁结构的应力状态,以及达到相同的应力水平下,盖梁所需要的最小配束情况。对比了沿一个方向依次架梁、由内及外架梁、由外及内架梁三种情况下的盖梁截面最大应力,并通过改变施工顺序,优化了预应力盖梁的配束,为今后预应力盖梁的设计及施工提供了参考。 In combination with the structure of a large cantilever prestressed cap beam of an express wayproject, the prestressed cap beam with an upper structure of a small box beam under different construction procedures, the stress state of prestressed cap beam structure and the smallest configuration required by cap beamafter reaching the same stress level are analyzed. The maximum stress of cap beam cross - section under three conditions of setting a beam, setting a beam from inside to outside and setting a beam from outside to insidesuccessively along one direction is compared. Through changing the construction sequence, the configuration of prestressed cap beam is optimized, thus providing reference for the design and construction of prestressed cap beamin the future.
出处 《北方交通》 2015年第11期13-16,20,共5页 Northern Communications
关键词 预应力盖梁 上部结构 施工顺序 受力 配束 Prestressed cap beam Upper structure Construction sequence Stress Configuration
  • 相关文献

参考文献5

二级参考文献4

共引文献19

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部