摘要
从优化掘进安装工序、爆破参数和过构造带支护方式等方面介绍了和顺李阳煤业公司煤巷快速炮掘施工工艺。通过加强设备管理和合理确定劳动施工组织,确保掘进施工的安全性和快速性。这些措施的实施有效地提高了煤巷安全掘进速度,保证了矿井正常接替。
The paper introduces the rapid blasting driving construction techniques from the aspects of the driving installation procedure optimization, the blasting parameter and the support methods when crossing structural belt, which can guarantee the safety and rapidity of driving construction and the normal relay by reinforcing the equipment management and rationally determining the labor construction organization.
出处
《江西煤炭科技》
2015年第4期33-34,共2页
Jiangxi Coal Science & Technology
关键词
煤巷
炮掘
工艺
设备管理
劳动组织
coal roadway
blasting driving
technique
equipment management
labor organization