摘要
大型水电工程的施工总进度是一项系统工程,介绍了大型水电工程施工总进度设计要素、设计深度、表达形式、编制软件及发展前景,结合工程实例,进一步论述了利用先进的技术手段提高设计工作效率、提升产品技术含量、丰富成果表达方式的方法。
As a systematic engineering work , the overall construction schedule design of large hydropower projects are introduced , including its main design elements , design depth , expression forms , software design and development pros-pects.With the analysis on an engineering example , some advanced technical approaches that could improve the design efficiency and enrich the expression forms are demonstrated .
出处
《水电与新能源》
2015年第11期26-28,共3页
Hydropower and New Energy
关键词
施工进度设计
设计三要素
系统工程
编制软件
construction schedule design
three elements of the construction schedule design
system engineering
soft-ware design