期刊文献+

基于贝叶斯网络的生物质气化中毒事故定量bow-tie分析

Quantitative Bow- Tie Analyses for Biomass Gasification Poisoning Accidents Based on Bayesian Network
下载PDF
导出
摘要 本文通过贝叶斯网络计算各原因事件的弗塞-维思利重要度,选取重要度较高的原因事件采取预防措施;并通过事件树分析确定控制措施,计算采取措施前后生物质气化中毒事故发生的概率,最后通过危险性评价矩阵对采取基于贝叶斯网络的bow-tie分析后的生物质气化中毒事故风险进行评价。结果表明,采用该方法只需对系统中部分节点采取安全措施即可有效降低事故发生概率,从而降低事故风险。 Fussell-Vesely worth of each event is calculated by Bayesian network .Prevention measures are adopted to the reason event with higher worth .The event tree analysis is conducted to determine control measures and calculate the probability of biomass gasification poisoning accidents before and after measures are taken .Finally the biomass gasification poisoning acci-dents after using bow-tie analysis based on Bayesian network are evaluated by risk assessment matrix .As the result ,this method can reduce probability and risk of accidents by adopting safety measures to parts of the whole points of the system .
出处 《工业安全与环保》 北大核心 2015年第11期64-67,83,共5页 Industrial Safety and Environmental Protection
基金 辽宁省自然科学基金(2013020137) 农业部农村能源专项(2012-27)
关键词 生物质气化中毒事故 bow-tie分析 贝叶斯网络 重要度 危险性评价矩阵 biomass gasification poisoning accident bow-tie analysis Bayesian network worth risk assessment ma-trix
  • 相关文献

参考文献9

  • 1Keith R Ctmmr,Robert C Brown. Ancillm7 cquilxnent for biommss gasficafion[J]. Bigness and Biocnergy,202(23):113- 128.
  • 2孟庆杰.生物质发电工程安全管理探讨[J].科技创业家,2013(23). 被引量:2
  • 3孙旋,牛秦洲,徐和飞,巫世晶,秦明,黄河潮.基于贝叶斯网络的人因可靠性评价[J].中国安全科学学报,2006,16(8):22-27. 被引量:29
  • 4Leu K L, Chen Y Y,Wey C L,et al. A bayesian network relia- bility modeling for flexray systems [J]. World academy of sci- ence, engineering and technology,2010(65) :42 - 47.
  • 5Refaul Ferdous,Faisal Khan,Rchan Sadiq,et al. Analyzing sys- tem safety and risks under uncertainty using a bow- tie dia- gram:An innovative approach[J]. Process safety and environ- mental protection, 2013,91(1/2.) : 1 - 18.
  • 6贾朋美,於孝春,宋前甫.Bow-tie技术在城镇燃气管道风险管理中的应用[J].工业安全与环保,2014,40(2):14-17. 被引量:17
  • 7Spouge John. New generic leak frequencies for process equip- ment[J]. Process Safety Progress,2005,24(4) :249 - 257.
  • 8Adam S. Markowski, Agata Kotynia. "Bow- tie" model in layer of protection analysis[J]. Process safety and environmental pro- tecfion,2011,89:205 - 213.
  • 9Intellect, Relex Software orporation.Reliability:A Practitioner's guide[M]. Beijing:Beijing University of Aeronautics and Astmnau-ties Press,2009.

二级参考文献20

  • 1潘家华.油气管道的风险分析(待续)[J].油气储运,1995,14(3):11-15. 被引量:46
  • 2Neville Stanton.Human Factors in Nuclear Safety[M].Taylor & Francis Ltd.,1996
  • 3Pierre Le Bot.Human Reliability Fata,Human Error and Accident Models-illustration through the Three Mile Island Accident Analysis[J].Reliability Engineering & System Safety,2004 (83):153~167
  • 4Swain A.D.,Guttmann H.E.,et al.Handbook of Human Reliability Analysis with Emphasis on Nuclear Power Plant Applications[R].NUREG/CR-1278,Washington,DC,1983
  • 5Cooper S E.,Ramey-Smith A M,Wreathall J.A Technique for Human Error Analysis[R].Washington,DC:NUREG/CR-6350,USNRC,1996
  • 6Erik H.Cognitive Reliability and Error Analysis Method[M].U.K.Oxford:Elsevier Science Ltd.,1998
  • 7Hollnagel E.CREAM[M].New York:Elsevier Science Ltd,1998
  • 8A.Mosleh,Y.H.Chang.Model-based Human Reliability Analysis:Prospects and Requirements[J].Reliability Engineering and System Safety,2004(83):241~253
  • 9Pearl J.Probabilistic Reasoning in Intelligent Systems[M].Networks of Plausible Inference.Morgan Kaufmann,san Mateo,CA,1988
  • 10Sucheta Nadkarn,Prakash P.Shenoy.A Causal Mapping Approach to Constructing Bayesian Networks[J].Decision Support Systems,2004 (38):259~281

共引文献45

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部