2Ke YL. Distribution Ieeder reconfiguration for load balancing and service restoration by using G-nets inference mechanism[J].IEEE Trans- actions on Power delivery,2004(19): 1426-1433.
2[6] Kandil M S,El-Debeiky S M,Hasanien N E.Overview and comparison of long-term forecasting techniques for a fast developing utility:Part I[J].Electric Power Systems Research,2001,58(1):11-17.
3[7] Barakat E H,Al-rashed S A.Long range peak demand forecasting under conditions of high growth[J].IEEE Trans on Power Systems,1992,7(4):1483-1486.