期刊文献+

考虑迁移工序结束时间的非对称二车间综合调度算法

Integrated Scheduling Algorithm of Two Asymmetry Workshops Taking the Finishing Time of Migration Process into Account
下载PDF
导出
摘要 针对以往相同两车间综合调度算法没有考虑工序迁移时间以及不能推广解决更普遍的非对称两车间的综合调度问题,提出考虑迁移工序结束时间的非对称二车间综合调度算法.该算法按动态关键路径法对工序进行排序,按序为工序选择车间;在选择车间时,设计基于迁移工序结束时间最小策略,将特殊工序选择到指定车间,将普通工序计算迁移时间后再选择能够最早完工的车间.实例表明,该算法不仅复杂度在二次项以内而且较优地实现具有不同设备资源的二车间分布式综合调度,并且无需分析迁移次数,有效的减少了产品完工时间. Aiming at that the problem that the past two same workshops integrated scheduling algorithm didn't take the finishing time of migration process into account and cannot solve general asymmetric two workshops scheduling, proposed integrated scheduling algo- rithm of two asymmetry workshops taking the finishing time of migration process into account. The algorithm sorting process according to the method of the dynamic critical path, Choosing the workshop in sequential for process, Designed the strategy of the end of the minimum time of migration process when the time choosing the workshop, assigned the special process to a fixed workshop and calcu- lating the migration time of the ordinary process then choose the workshop which can earlier completion. The instance shows that, the algorithm not only the complexity within two times but also can achieve distributed integrated scheduling in two workshops with differ- ent equipment resources better,don't need to analyze the numbers of migration, at the same time,reduce the product finishing time ef- fectively.
出处 《小型微型计算机系统》 CSCD 北大核心 2015年第12期2740-2744,共5页 Journal of Chinese Computer Systems
基金 国家自然科学基金项目(61370086 61370083)资助 黑龙江省自然科学基金项目(F201101)资助 黑龙江省教育厅科技项目(12531105)资助 黑龙江省博士后科研启动项目(LBH-Q13092)资助 全国高等学校计算机教育研究会教育研究课题项目(ER2014018)资助 现代制造技术与刀具开发黑龙江省高校重点实验室开放课题项目(2012DJ-003)资助
关键词 综合调度算法 非对称二车间 动态关键路径法 迁移工序结束时间 integrated scheduling algorithm two asymmetry workshops DCPM the finishing time of migration process
  • 相关文献

参考文献10

二级参考文献69

共引文献74

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部