基于保护动作概率模型的距离保护误动识别 被引量:5

Misoperation Identification of Distance Protection Based on Protection Operation Probability Model
下载PDF
导出
摘要 由于潮流转移过负荷、整定值不合理引起的后备保护误动跳闸可能引发大规模停电事故。针对目前研究计算和通信规模较大、没有考虑误动概率等不足,建立保护监测评估系统。首先,基于测量值和保护动作边界距离建立保护元件动作概率模型,根据传统保护系统的分布式结构构建保护运行监测评估系统架构,制定保护误动的识别流程,并简单介绍针对可能误动的保护采取的闭锁并修改保护动作特性等措施;然后分析非故障线路在某些情况下可能被误动保护切除的案例。结果表明,所提方法能够快速确定线路故障及保护动作情况,可以根据误动概率识别当前存在误动危险的保护,避免保护误动事故发生。 Misoperation of backup relays caused by flow transferring or improper settings would trigger large-scale blackouts. In allusion to deficiencies of current researches, such as the large amount of computation and communication, and without considering protection probabilities, a protection monitoring and evaluation system was established. First of all, an operation probability model of protection relays was proposed and the hierarchical protection monitoring and evaluation framework was thereafter established according to the distributed structure of traditional protection systems. The identification process of protection misoperation was proposed. Some measures for relays with misoperation risk including blocking these relays and changing protection operation characteristic are also briefly introduced. Cases with regard to non-fault transmission line removed by protection misoperation are analyzed. The results show that the proposed method could quickly confirm the fault line. It could be used to detect protective relays with misoperation risks based on operation probability to prevent protection malfunction accidents.
出处 《中国电机工程学报》 EI CSCD 北大核心 2015年第23期6057-6065,共9页 Proceedings of the CSEE
基金 国家自然科学基金项目(51307059) 河北省自然科学基金项目(E2014502065) 中央高校基本科研业务费专项资金(2014MS86)~~
关键词 距离保护 运行监测 概率模型 过负荷 潮流转移识别 distance protection operational monitoring probabilistic model overload flow transferring identification
  • 相关文献

参考文献26

  • 1刘文颖,梁才,徐鹏,但扬清,王佳明,王维洲.基于潮流介数的电力系统关键线路辨识[J].中国电机工程学报,2013,33(31):90-98. 被引量:78
  • 2曾凯文,文劲宇,程时杰,卢恩,王宁.复杂电网连锁故障下的关键线路辨识[J].中国电机工程学报,2014,34(7):1103-1112. 被引量:46
  • 3周泽昕,王兴国,杜丁香,李岩军,李明.过负荷状态下保护与稳定控制协调策略[J].中国电机工程学报,2013,33(28):146-153. 被引量:16
  • 4The Enquiry Committee. Report of the enquiry committee on grid disturbance in Northern Region on 30th July 2012 and in Northern, Eastern & North-Eastern Region on 31 st July 2012[R]. New Delhi: Ministry of Power, Government of India, 2012.
  • 5国家电网公司.印度大面积停电事故有关情况通报[R].北京:国家电网公司,2012.
  • 6U. S. -Canada Power System Outage Task Force. Final report on the August 14th blackout in the United States and Canada: causes and recommendations[R]. Natural Resources Canada and U.S. Department of Energy, 2004.
  • 7The Investigation Committee. Final report of the investigation committee on the 28 September 2003 blackout in Italy[R]. Brussels: Union for the co-ordination of transmission of electricity (UCTE), 2004.
  • 8The Investigation Committee. Final report, system disturbance on 4 November 2006[R]. Brussels: Union for the co-ordination of transmission of electricity (UCTE), 2007.
  • 9林伟芳,孙华东,汤涌,卜广全,印永华.巴西“11·10”大停电事故分析及启示[J].电力系统自动化,2010,34(7):1-5. 被引量:142
  • 10董新洲,曹润彬,王宾,施慎行,Dominik Bak.印度大停电与继电保护的三大功能[J].电力系统保护与控制,2013,41(2):19-25. 被引量:23

二级参考文献241

共引文献599

同被引文献76

引证文献5

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部