期刊文献+

基于储能型DVR双馈风电机组高电压穿越技术研究 被引量:1

High Voltage Ride-through of Doubly Fed Induction Wind Generators Using Energy-based DVR
下载PDF
导出
摘要 在通过对风电机组高电压穿越技术概念的理解及以往出现因高电压而导致大规模风电机组脱网事故的研究分析的前提下,提出了一种在等效超级大电容(Super-capacitor,SC)储能的基础上配合动态电压补偿器(DVR)实现双馈风电机组高电压穿越的方案。在电网电压骤升的情况下,基于储能型动态电压补偿器系统能对风电机组机端电压进行完全补偿,使得风电机组机端电压始终维持在正常运行水平而持续工作不脱网,同时系统输出有功功率以确保电网吸收的有功功率和DFIG输出的有功功率间的平衡。在MATLAB/Simulink仿真平台上搭建仿真模型并进行仿真,结果表明所提出基于储能型动态电压补偿器风电机组高电压穿越技术方案的具有可行性。 A high voltage ride-through scheme of Doubly Fed Induction Wind Generator (DFIG) based on super-capacitor- based Dynamic Voltage Restorer (DVR) is proposed by understanding the concept of high voltage ride-through and analyzing large-scaled off-grid events. In order to maintain generator terminal voltage at normal level, the DFIG stator voltage is fully compensated by super-capacitor-based DVR under the condition of grid voltage swells, and meanwhile, the output power of super-capacitor-based DVR system will maintain the balance of grid-absorbed power and DFIG output power. A simulation model is established in MATLAB/Simulink, and the analysis results prove the effectiveness of proposed method.
出处 《水力发电》 北大核心 2015年第12期105-108,共4页 Water Power
基金 教育部创新团队(IRT1285) 博士点专项基金(20126501130001) 自治区重大专项(201230115)
关键词 双馈风力发电机组 电压骤升 高电压穿越技术 高电压并网准则 超级大电容 动态电压补偿器 doubly fed induction wind generator voltage swell high voltage ride-through high voltage grid code supercapacitor dynamic voltage restorer
  • 相关文献

参考文献9

  • 1董咪.金风科技2.5MW机组率先通过国内高电压穿越测试[N].中国工业报,2013-1-22.
  • 2MUYSEEN S M, TAKAHASHI R, MURATA T, et al. Low voltage ride-through capability enhancement of wind turbine generator systemduring network disturbanee [ J ]. IET Renewable Power Generation, 2009, 3(1) : 65-74.
  • 3ESKANDER M N, AMER S I. Mitigation of voltage dips and swells in grid-connected wind energy conversion systems [ C ] //Proceedings of the ICROS-SICE International Joint Conference. Fukuoka, Japan, IEEE, 2009: 885-890.
  • 4NIELSEN J G, BLAABJERG F. A detailed comparison of system to- pologies lot dynamic voltage restorers [ J ]. IEEE Transactions on In- dustry Applications, 2005, 41 (5) : 1272-1280.
  • 5Ebrahim Babaei, Amin Nazarloo, Seyed Hossein Hosseini. Applica- tion of Flexible Control Methods for D-STATCOM in Mitigating Voltage Sags and Swells [ J ]. IPEC, 2010 : 590- 595.
  • 6徐海亮,章玮,陈建生,孙丹,贺益康.考虑动态无功支持的双馈风电机组高电压穿越控制策略[J].中国电机工程学报,2013,33(36):112-119. 被引量:91
  • 7谢震,张兴,杨淑英,宋海华,曲庭余.基于虚拟阻抗的双馈风力发电机高电压穿越控制策略[J].中国电机工程学报,2012,32(27):16-23. 被引量:65
  • 8Australian Energy Market Commission. National electricity rules[ R/ OL]. [2008-10-21]. http: //www. aemc. gov. au.
  • 9李霄,胡长生,刘昌金,徐德鸿.基于超级电容储能的风电场功率调节系统建模与控制[J].电力系统自动化,2009,33(9):86-90. 被引量:103

二级参考文献54

共引文献221

同被引文献12

引证文献1

二级引证文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部