摘要
该文针对A公司婴儿培养箱产品装配的现状,应用时间研究等基础工业工程手段进行生产流水线的分析与设计,并通过仿真软件Flexsim进行流水线的建模仿真,对比仿真的结果和实际数据发现流水线存在的问题,对其进行优化处理,得到高效率的流水线设计方案。
According to current assembly situation of infant incubator in company A, basic industrial engineering means such as time study was used to analyze the actual products assembly production and an assembly line was designed. The assembly line was modeled and simulated with software Flexsim. The problem of the assembly line was found by comparing simulation result and actual data, then through optimization to obtain high efficiency assembly line.
出处
《中国医疗器械杂志》
2015年第6期421-422,431,共3页
Chinese Journal of Medical Instrumentation
基金
宁波市重大科技专项项目(2015C110033)