大桥高墩翻模法施工的模板设计计算分析

Design and calculation analysis of framework in turning over mold method construction for high pier of bridge
下载PDF
导出
摘要 介绍了某大桥的修建背景和基本资料,概述了高墩翻模法施工的模板设计尺寸和基本性能及计算荷载,计算并验算了面板的强度和刚度,并采用Midas软件对模板背楞的整体应力和刚度进行了检算。结果表明,在水泥混凝土浇筑速度为2.0 m/h以下时,模板的强度和刚度满足规范要求,研究结果对同类工程中的高墩翻模法施工和设计具有借鉴意义。 Firstly, the construction background and basic information of the bridge wereintroduced, and then the size and property, as well as the loads, of the designed framework used with turning over mold method in high pier bridge construction were elaborated.After that, the strength and stiffness of framework plate was analyzed, and the dorsal bar strength and stiffness were also analyzed with MIDAS software.The results showed that as the concrete pouring speed is controlled under 2.0 m/h,the strength and stiffness of the framework are satisfied with the design specifications.The results of this paper was quite useful for framework design and construction with turning over mold method in other similar engineering cases.
作者 黎洪瑞 钟剑
出处 《企业技术开发》 2015年第11期76-78,84,共4页 Technological Development of Enterprise
关键词 高墩翻模法 模板设计 计算分析 强度 刚度 high Pier turning over mold method framework design, calculation analysis strength stiffness
  • 相关文献

参考文献5

  • 1JTGffF50-2011.公路桥涵施工技术规范[S].
  • 2JTJ025-86.公路桥涵钢结构及木结构设计规范[S].[S].北京,1988..
  • 3JTG D50-2004,公路桥涵设计通用规范[S].
  • 4杨文渊,徐彝.桥梁施工工程师手册(第二版)[M].北京:人民交通出版社,2006.
  • 5赵明华,尹平保,张永杰,杨明辉.高陡斜坡段桩柱式桥墩基础设计计算方法研究[J].工程力学,2013,30(3):106-111. 被引量:21