摘要
根据磨河水库工程建设现状,结合库区沿岸地形地质条件,选择了两个取水泵站方案,从年供水量、取水建筑物和供水线路布置、施工条件、管理运行、工程投资等方面对这两个方案进行比较,选取了最优的取水泵站方案,取水泵站方案的选择,为磨河供水工程的顺利进行奠定了基础。
According to construction status of Mohe reservoir engineering, and combined terrain geological condition of the reservoir, two pumping station schemes were selected. Two schemes were compared from annual water supply quantity, water intake structure, water supply route layout, cconstruction condition, management and operation,works' investment and other aspects, than the optimal pumping station scheme was selected. Selection of pumping station scheme laid the foundation for Mohe water supply works.
出处
《山西水利科技》
2015年第4期14-15,28,共3页
Shanxi Hydrotechnics
关键词
磨河水库
取水泵站
供水线路
Mohe Reservoir
pump station
water supply route layout