汾河二库大坝帷幕灌浆施工

Curtain Grouting Construction in the Dam Foundation of the Second Fenhe Reservoir
下载PDF
导出
摘要 文中简要地介绍了汾河二库的帷幕灌浆施工技术方法,在灌浆结束后通过对灌浆前后渗流量对比表明灌浆后坝基渗漏量比灌浆前减少了90.2%,说明此次灌浆效果良好,达到了设计的目的。 The paper briefly introduces the technical method of constructing the curtain grouting in the dam foundation of the Second Fenhe Reservoir. After finishing the grouting works and comparing the seepage quantity after grouting with the quantity before grouting,it indicates that the former value has decreased by 90.2%compared with the latter value,therefore,the effect of grouting is good,and the design target has been reached.
作者 周永红
出处 《山西水利科技》 2015年第4期43-44,54,共3页 Shanxi Hydrotechnics
关键词 帷幕灌浆 施工技术 汾河二库 curtain grouting construction technigue the Second Fenhe Reservior