摘要
以上海市某古建筑门厅石柱纠偏处理为例,分析了石柱倾斜的原因,提出了顶推法纠偏方案,并对顶推法纠偏的反力装置和保护措施进行了阐述,通过倾斜测量表明该纠偏方案达到了预期的施工效果。
Taking the an ancient building hall peristele deviation correction treatment in Shanghai as an example,this paper analyzed the peristele tilting reasons,put forward the pushing method deviation correction scheme,and elaborated the reaction rectifying device and protection measures of pushing method,through the tilting measurement showed that the deviation correction scheme achieved expected construction effect.
出处
《山西建筑》
2015年第34期42-43,共2页
Shanxi Architecture
关键词
古建筑
局部构件
纠偏
顶推法
ancient architecture
local component
correction
pushing method