600MW燃煤发电机组烟气超低排放改造方案对比 被引量:5

Modification scheme comparison of ultra lowfluegas emission in 600 MW coal-fired generating unit
下载PDF
导出
摘要 为保证污染物排放指标达到超低排放标准,华能铜川照金电厂一期2×600MW燃煤发电机组进行了烟气超低排放改造。提出了低低温省煤器+湿烟囱改造方案及管束式换热器(MGGH)+干烟囱改造方案,分别从经济性、施工工期、施工难点及环境影响等方面对2个方案进行了对比分析,经综合比较,推荐MGGH+干烟囱改造方案。 2 × 600 MW coal-fired generating unit of Huaneng Tongchuan Zhaojin Power Plant phase 1 starts to have modification for flue gas emission in order to make sure to meet standard for ultra low discharge of pollutants.This paper brought up two plans and analyzed them through investment,economy,construction period,construction difficulties,environment and other factors.One is low temperature economizer plus wet chimney modification,the other one is MGGH plus dry chimney modification,which is recommended after an integrated assessment.
出处 《华电技术》 CAS 2015年第10期65-68,79,共4页 HUADIAN TECHNOLOGY
关键词 燃煤发电机组 烟气 超低排放 低低温省煤器 湿烟囱 管束式换热器 干烟囱 coal-fired generating unit flue gas ultra low emission wet chimney MGGH dry chimney
  • 相关文献

参考文献2

  • 1西安热工研究院有限公司.华能铜川照金电厂一期2×600MW机组超低排放工程可行性研究报告[R].西安:西安热工研究院有限公司,2014.
  • 2西安热工研究院有限公司.华能铜川照金电厂一期2X600MW机组超低排放工程初步设计[R].西安:西安热工研究院有限公司,2014.