期刊文献+

一种资源约束项目调度问题的遗传算法

A resource constrained project scheduling problem genetic algorithm
下载PDF
导出
摘要 资源约束项目调度问题是项目管理研究的大问题,对于项目管理的研究者和实践者都非常重要,该问题理论上属于NP难题。针对经典资源受限项目调度问题,本文结合教学算法和遗传算法,提出了一种新的智能优化算法——教学遗传算法来求解。通过对资源受限项目调度标准数据集PSPLIB中多个项目调度问题的仿真及与现有文献中的相关算法的比较,验证了所提算法的有效性。 resource constraint project scheduling problem is a big problem project management research, project management for researchers and practitioners are very important, the problem theoretically belongs to NP-hard. For classic resource-constrained project scheduling problem, this paper teaching algorithm and genetic algorithm, a new intelligent optimization algorithm- genetic algorithm to solve teaching. Simulation and comparison of resource constrained project scheduling standard data set PSPLIB multiple project scheduling problems with the existing literature related algorithms to verify the effectiveness of the proposed algorithm.
作者 段向阳
机构地区 湖南工业大学
出处 《湖南城市学院学报(自然科学版)》 CAS 2015年第3期75-78,共4页 Journal of Hunan City University:Natural Science
关键词 资源约束 项目调度 教学遗传算法 resource constraints project scheduling genetic algorithm teaching
  • 相关文献

参考文献10

  • 1Blazewicz J, Lenstra J K, Rinnooy Kan A H G. Scheduling Subject to Resource Constraints:Classification and Complexity [J]. Discrete Applied Mathematics, 1983(5): 11-24.
  • 2Mingozzi A, Maniezzo V, Ricciardelli S. An exact algorithm for project scheduling with resource constraints based on a new mathematical formulation [J], Management Science,1998(5): 714-729.
  • 3Boctor F E A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes [J]. European Journal of Operational Research, 1996:349-361.
  • 4熊鹰,匡亚萍.施工项目工期-成本优化问题的蚁群算法[J].浙江大学学报(工学版),2007,41(1):176-180. 被引量:24
  • 5Boctor F F,Resource-constrained project scheduling by simulatedannealing[J].International Journal of Production Research, 1996, 34:2335-2351.
  • 6Baar T, Brucker P.Tabu-search algorithms for the resource- constrained project scheduling problem.Technical Reprot, Universitt Osnabriick, 1997.
  • 7Hamnn S. A self-adapting genetic algorithm for project scheduling under resource constraints. [J].Naval Research Logistics, 2002: 433-44g.
  • 8郑超,高连生.蚁群算法在资源受限项目调度问题中的应用[J].计算机工程与应用,2005,41(27):205-208. 被引量:16
  • 9张维存,康凯.蚁群-粒子群算法求解多模式资源受限项目调度问题[J].计算机工程与应用,2007,43(34):213-216. 被引量:7
  • 10王凌,郑环宇.一种多目标资源受限项目调度问题的教学算法[J].控制与决策,2015,30(10):1868-1872. 被引量:16

二级参考文献47

  • 1J Blazewicz et al.Scheduling subject to resource constraints:classification and complexity[J].Discrete Applied Mathematics, 1983; (5):11~24
  • 2S Hartmann,R Kolisch. Experimental evaluation of state-of-the-art heuristic for the resource constrained project scheduling problem[J].European Journal of Operational Research ,2000; 127(2) :394~407
  • 3A Sprecher. Resource-constrained project scheduling-Exact methods for the multi-mode case[M].Lecture Notes in Economics and Mathematics N°409,Berlin,Germany:Springer,1994
  • 4M Dorigo. Optimization , learning , and natural algorithms[D].Ph D dissertation(in Italian).Dipartimento di Elettronica,Politecnico di Milano,Italy,1992
  • 5M Dorigo et al. Ant colony system:A cooperative learning approach to traveling salesman problem[J]. IEEE Transactions on Evolutionary Computation, 1997; 1 ( 1 ): 53~66
  • 6R Kolisch,A Sprecher. PSPLIB-A project scheduling problem library[J].European Journal of Operational Research, 1997 ;96 ( 1 ): 205~216
  • 7M Dorigo et al. Ant algorithms for discrete optimization[J].Artificial Life, 1999 ;5(3): 137~172
  • 8E L Demeulemeester,W S Herroelen. Project scheduling:a research handbook[M].Boston:Kluwer Academic Publishers,2002
  • 9FENG Chung wei,LIU Liang,BURNS S A, Using genetic algorithms to solve construction time-cost trade-off problems [J]. Journal of Computing in Civil Engineering, 1997, 11(3):184-189.
  • 10KELLY J E. Critical path planning and scheduling:mathematical basis [J]. Operations Research, 1981,9(3): 296-320.

共引文献57

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部