期刊文献+

低施工净空条件下的山区河流大跨度钢桁梁架设方案比选研究 被引量:1

Comparison and Selection of Construction Schemes for Long-span Steel Truss Girder Erection over Mountain Streams under Low Construction Clearance Condition
下载PDF
导出
摘要 在山区河流进行桥梁施工相比常规条件更加复杂,当桥梁施工还受到限高影响时,桥梁施工的难度和风险倍增。文中以新建成贵铁路菜坝岷江特大桥钢桁梁架设施工为例,针对该桥施工净空低、山区河流、薄覆盖层等工程特点,提出了3种钢梁架设施工方案,并分别从受力安全、施工难度、经济投入和施工工期等方面进行比选,最终给出本工程的最优施工方案。 The bridge construction over Mountain Streams is much more complicated than conventional construction. When the bridge construction was influenced by aviation limited height, the construc- tion difficulty and risk will be redoubled. In this paper, taking example for the new Caiba Minjiang River Bridge on Chengdu--Guiyang Railway, three construction schemes were proposed for the course characteristic of low clearance during the construction stage, the mountain streams and thin covering layer, etc. After the load bearing safety, the degree of construction difficulty, economic investment and the construction schedules were compared from these three schemes, the most suitable scheme was chosen at the end of this paper.
作者 刘玲晶
出处 《交通科技》 2015年第6期4-7,共4页 Transportation Science & Technology
关键词 钢梁架设 低净空施工 山区河流 薄覆盖层 方案比选 steel truss girder erection low clearance construction mountain streams thin overburdenlayer scheme comparison and selection
  • 相关文献

参考文献6

二级参考文献12

共引文献37

同被引文献4

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部