以汇山地块滨江公共环境建设项目江水冷却系统取水口、慢滤渗水池工程深基坑和水域围堰施工为例,探究陆域基坑与水域围堰相结合的结构形式、施工部署和施工工艺,确保工程顺利推进,提升多元化现代工程项目管理质量。
The deep foundation pit and cofferdam construction of water intake and slow filtration and infiltration basin of river water cooling system for the riverside public environmental construction project on Huishan Plot were taken as examples to explore the structural type, construction design and process of combined foundation pit on land and cofferdam in water area, to ensure the smooth engineering implementation and to promote plural modem engineering project management quality.
出处
《建筑技术开发》
2015年第12期27-29,共3页
Building Technology Development
关键词
深基坑
水域围堰
围护结构
SMW工法桩
钢板桩
deep foundation pit
cofferdam in water area
enclosure structure
SMW pile