摘要 以襄渝铁路下行线新大成隧道碎石道床沉降病害整治工程为依托,利用物探手段和室内试验对病害进行分析,结合运营铁路隧道维修管理特点,采用注浆技术整治隧道道床沉降,实践结果表明:利用注浆技术在隧道施工封锁天窗内施工,对铁路运输生产影响小,施工较为便捷,整治效果较为明显。 Relying on remediation of sedimentation of ballast bed of Xindacheng Tunnel in the downlink of Xiangyang-Chongqing Railway,geophysical methods and laboratory test are used for analyzing the disease.Combined with maintenance and management characteristics of the railway tunnel under operation,the grouting technology is adopted for remediation of tunnel roadbed settlement. The practical results show that the grouting technology is adopted for construction in blocked roof of tunnel,which has small impact on the railway transportation and production and the construction is convenient,so the remediation effect is much better.
作者 崔齐飞
出处 《路基工程》 2015年第6期174-177,共4页 Subgrade Engineering
基金 西安铁路局科研项目(2014GY202)
关键词 铁路隧道 隧道基底 下沉 混凝土 注浆 railway tunnel tunnel bed sedimentation concrete grouting
  • 相关文献

参考文献3

  • 1铁道第二勘察设计院.改建铁路襄渝线安康至重庆段增建第二线设计资料[Z].2005.
  • 2彭立敏,覃长炳,施成华,黄林冲.铁路隧道基底病害整治现场试验研究[J].中国铁道科学,2005,26(2):39-43. 被引量:39
  • 3西安铁路局科学技术研究所.小棕溪隧道整体道床下沉病害注浆技术的应用与研究报告[R].2011.

二级参考文献3