期刊文献+

港珠澳大桥西人工岛现浇隧道暗埋段钢筋安装施工工艺 被引量:1

Construction technology of steel bar installation in buried section of cast-in-situ tunnel in the Hongkong-Zhuhai-Macao Bridge west artificial island
下载PDF
导出
摘要 港珠澳大桥通过设置东、西人工岛实现桥隧转换,其中西人工岛设置岛上段隧道暗埋段以实现岛隧的衔接,并提供沉管对接安装条件。由于施工地处外海深基坑,且隧道结构形式复杂,配筋率高,预埋件数量多,钢筋安装极为困难。以西人工岛隧道暗埋段CW1、CW2为例,详细介绍了西人工岛现浇隧道暗埋段钢筋安装施工工艺,以及施工质量保证措施。 Hongkong-Zhuhai-Macao Bridge realized the conversion of bridge and tunnel through the east and west artificial island, the west artificial island have been set the tunnel buried section to achieve the cohesion of artificial island and tunnel, and the butt joint installation condition of immersed tubes was provided. Because the construction is located in the offshore deep foundation pit, and tunnel structure is complex, reinforcement ratio is extremely high, embedded parts number is high, the steel bar installation is extremely difficult. Taking the west artificial island tunnel buried sections of CW1, CW2 as an example, we introduced the construction technology of steel bar installation in buried section of cast-in-situ tunnel in west island, and the construction quality assurance measures.
出处 《中国港湾建设》 2015年第11期85-89,119,共6页 China Harbour Engineering
关键词 港珠澳大桥 西人工岛 暗埋段 钢筋安装 质量保证措施 Hongkong-Zhuhai-Macao Bridge west artificial island buried section steel bar installation quality assurance measures
  • 相关文献

参考文献5

二级参考文献5

共引文献51

同被引文献4

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部