期刊文献+

预制沉管大型预埋件精确安装技术 被引量:3

Precision installation technology of large embedded parts in prefabrication of immersed tube
下载PDF
导出
摘要 港珠澳大桥岛隧工程预制沉管结构尺寸和埋置深度大,为满足隧道预制、安装施工和使用的要求,设置了数量众多的预埋件,按预埋件的功能可分为结构受力、止水、安装辅助。沉管预制中大部分预埋件主要作用是防水,为了保证工程质量,必须严格控制其精度。文章主要介绍港珠澳大桥沉管预制中大型预埋件精确安装技术,包括端钢壳、OMEGA、中埋式止水带等。经工程实践,该技术可靠有效。 The prefabricated immersed tube of Hongkong-Zhuhai-Macao Bridge island and tunnel project has large structure size and great embedment depth, a large number of embedded parts are set up to meet the requirements of prefabrication, installation and use of the tunnel, the embedded parts are classified as force, water stop, auxiliary installation according to their functions. The major role of most embedded parts in prefabrication of immersed tube is waterproof, their accuracy must be controlled strictly in order to ensure the construction quality. This paper introduced the precision installation technology of large embedded parts in prefabricated immersed tube of the Hongkong-Zhuhai-Macao Bridge, including the end steel shell, OMEGA, buried water stop, and so on. The engineering practices prove that the technology is reliable and effective.
出处 《中国港湾建设》 2015年第11期98-101,109,共5页 China Harbour Engineering
关键词 沉管 预埋件 精确安装 端钢壳 中埋式止水带 OMEGA immersed tube embedded parts precise installation end steel shell OMEGA buried water stop
  • 相关文献

参考文献3

二级参考文献16

  • 1管敏鑫.钢筋混凝土沉管隧道在设计与施工中的有关问题[J].现代隧道技术,2007,44(1):1-4. 被引量:5
  • 2ITA Work Group. Immersed and floating tunnels [ J ]. Tun- nelling and Underground Space Technology, 1997,12 (2): 93 - 109.
  • 3The Oresund techinical publication. Tunnel [ M ]. Oresunds- bro Konsortiet, 2001.
  • 4Chris Marshall. The Oresund tunnel: Making a success of design and build [ J ]. Tunnelling and Underground Space Technology, 1999,14(3) :355 - 365.
  • 5W P S Janssen, Steen Lykke. The fixed link across the Ore- sund: Tunnel section under the Drogden [ J ]. Tunnelling and Underground Space Technology," 1997,12( 1 ) :5 - 14.
  • 6W Jassen, P de Haas, Y H Yoon. Busan-Geoje Link: Im- mersed tunnel opening horizons [ J ]. Tunnelling and Under- ground Space Technology,2006,21 (3) : 332.
  • 7L C F Ingerslev. Considerations and strategies behind the design and construction requirements of the Istanbul Strait immersed tunnel [ J ]. Tunnelling and Underground Space Technology, 2005,20 (6) : 604 - 608.
  • 8陈绍章.沉管隧道设计与施工[M].北京:科技出版社,2002.
  • 9Hall,P."evelopment of immersed tunnels in Canada and Hong Kong"[].Immersed tube techniquesProceedings of the conference.1989
  • 10Budge-Reid,A.J,D Phillips,R.F.Bayliss."Hong Kong Airport Railway western immersed tube tunnel-planning"[].Immersed tunnel techniquesProceedings of the international conference.1997

共引文献47

同被引文献12

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部