摘要
根据装配式钢筋混凝土桥梁的基本特点,介绍了其施工的前期准备工作及地基处理方法,并结合实例,从梁的形状尺寸、混凝土设计、桥梁施工等方面,提出了具体的施工方法,为其在桥梁工程中的推广应用积累了经验。
According to the basic characteristics of prefabricated reinforced concrete bridge, this paper introduced its construction preparatory work and foundation treatment method, and combining with the examples, from the shape and size of beam, concrete design, bridge construction and other aspects, put forward specific construction methods, accumulated experience for its popularization and application in bridge engineering.
出处
《山西建筑》
2015年第36期175-176,共2页
Shanxi Architecture
关键词
装配式桥梁
地基处理
钢筋混凝土
prefabricated bridge, foundation treatment, reinforced concrete soil