期刊文献+

杭州地铁2号线钱塘江江北风井承压水治理技术

Confined Water Treatment Technology Adopted in the Riverside Ventilation Shaft Project of Hangzhou Metro Line 2
下载PDF
导出
摘要 杭州地铁2号线钱塘江江北风井工程紧邻钱塘江北岸大堤,地质情况复杂,涉及到的承压含水层为圆砾层,基坑降水难度较大;周边还有交通银行、庆春路隧道等重大建构筑物,对环境保护要求高。针对这些特点,详细介绍和分析了该工程承压水治理方案,供类似工程参考。 The Jiangbei ventilation shaft project on Hangzhou metro Line 2, which lies on the north bank of Qiantang River, is facing complicated geological conditions, confined aquifer of the ancient riverkr_d gravel layer and difficult foundation pit dewatering, the station is also surrounded by some important buildings, such as the Bank of Communications and the Qing- chun Tunnel, so the environmental protection requirements are very strict. In view of these characters, the confined water treatment scheme is introducedin detail to provided a reference for similar engineering.
作者 沈峰
出处 《城市轨道交通研究》 北大核心 2015年第12期128-131,共4页 Urban Mass Transit
关键词 过江地铁 风井 承压水治理 cross-river metros ventilation shafts confinedwater treatment
  • 相关文献

参考文献1

二级参考文献2

  • 1彭易华,龙建中,陈树林,等.GB50027-2001供水水文地质勘察规范[S].北京:中国计划出版社,2001:18-26.
  • 2常士骠.工程地质手册[M].4版.北京:中国建筑工业出版社,2007:1023.

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部