电力系统发展性故障实例分析 被引量:2

Study on Power System Developing Fault
下载PDF
导出
摘要 随着电力系统网架的成熟,继电保护、智能自动化等关键技术的普遍应用,以及近年来电力企业安全生产风险管理体系的逐步成熟和闭环管控手段产生的实效等,使电力系统中的大面积停电事故越来越少。但由于某些局部电网依然存在着特殊性或复杂性导致偶有变电站失压、电力设备非计划停运、发电机频繁甩负荷等电力安全事件发生,给电力企业的运营和管理带来极大的风险。本文以一起变电站单相转三相和两相转三相的发展性接地故障为例,对复杂局部电网的事故状态进行还原和分析,有助于优化管理手段,制定针对性防范措施,将故障防范于未然。 The power system blackouts becomes less and less because to the maturation of grid power system and the widespread application of relay, intelligent automation and other key technologies, and the gradual maturity of production safety risk management system recently and Closed-loop control of the means to be effective. Occasionally lose voltage substations, electrical equipment unplanned outages, generators frequent load shedding and other electrical safety incidents because there are still some local grid particularity or complexity; this is a tremendous risk to the electricity business operations and management. In this paper, the development of a ground fault substation that single-phase transfer switch three-phase and two-phase transfer switch three-phase, for example, reduction and analysis the accident state of the local power grid complex to help optimize the management tools to develop targeted preventive measures.
作者 黄金
出处 《电气技术》 2015年第10期111-113,116,共4页 Electrical Engineering
关键词 变电站 发展性故障 接地 小电源解列 Substation developing fault grounding small power splitting
  • 相关文献

参考文献6

二级参考文献8

共引文献30

同被引文献25

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部