《合同法》第286条首次确立了建设工程优先受偿,这一制度设计极大的保护了承包人的权益,随后2002年最高人民法院以《批复》的形式细化了建设工程优先受偿权在行使过程中几个重要问题。文章从承包人如何在各阶段利用好建设工程优先受偿权出发,对建设工程优先受偿权的若干理论和实践问题进行了分析和研究,以期对承包人有所裨益。
"Contract Law" 286 th has set up the construction project priority for the first time. This system design protects the rights and interests of the contractor, and then in 2002 the Supreme People's court in the form of "approval" has detailed several important issues in the priority of construction projects. This paper analyzes and studies the theoretical and practical problems of the priority of construction projects, which is helpful to the construction of the contract.
出处
《北京市工会干部学院学报》
2015年第4期42-44,共3页
Journal of Beijing Federation of Trade Unions Cadre College
关键词
承包人
优先受偿权
性质
放弃
限制及突破
the contractor
the priority
the nature
limitation and breakthrough