南钢2×1800m^3高炉开炉实践

Blow-in Practice of 2×1800m^3 Blast Furnace
下载PDF
导出
摘要 新建的2×1800^3高炉开炉分为三个阶段,第一阶段开炉准备,包括各种原燃料及培训学习准备、做好各种预案;第二阶段做好高炉开炉料的理论配料计算及加料要求;第三阶段点火开炉,包括点火初始风口配置及第一炉出铁要求等。通过精心准备,两座高炉均实现快速开炉达产。 Blowing-in of New-built 2 ×1800m^3 BF was divided into three stages: The first is preparing blow-in, including preparing materials and fuels and training, making the preparedness plans. The second is calculation of burden and charging. The third is blow-in , including collocation of the tuyeres at the beginning of and tapping of the first heat. Af- ter good preparation, two blast furnaces have reached its design capacity at its commissioning.
作者 许定胜
机构地区 第二炼铁厂
出处 《南钢科技与管理》 2015年第4期39-42,共4页 NISCO Technology and Management
关键词 高炉开炉 铁水分流 风口配置 反应后强度 料面测试 blow-in molten iron shunting collocation of tuyeres strength after reaction test for charge lever surfacecondition