摘要
简要介绍惠州抽水蓄能电站地下厂房离相封闭母线等发电电压设备的安装,对母线及其电压设备安装工序、质量点控制及安全防范对策进行了分析、总结,介绍了典型设备安装工艺方法。安装阶段解决了设备布置复杂、安装难度大的问题。
The paper briefly introduces the procedures and techniques for installation of power generation voltage equipments, such as enclosed busbar of separated phase, as well as the installation method of typical equipments; besides, the safety measures during the installation are analyzed and summarized, well solving the problems of complicated layout of equipments and installation difficulties.
出处
《红水河》
2015年第6期57-60,共4页
Hongshui River
关键词
抽水蓄能电站
发电电压设备
安装技术
pumped storage power station
power generatior, voltage equipments
installation technology