3CHEN L R.Development and problems of steel struc-ture project in China. Steel Structure Project . 1996
4YANG M Y,LI B Z.A web-based Information flowmanagement system for construction design. Pro-ceedingsof 8th REHVA World Congress-Experience theFuture of Building Technologies . 2005
5MAJUMDAR T,FISCHER M,SCHWEGLER B R.Conceptual DesignReview with a Virtual Reality Mock-UpModel. Joint InternationalConference on Computingand Decision Making in Civil and BuildingEngineering . 2006
6CHUCK EASTMAN,PAUL TEICHOLZ.BIM Handbook. . 2011
7Li Baizhan,Yang Mingyu,Liu Xiaodong,Liu Ling.A workflow management system based-on construction project designing. International Journal for Housing Science and Its Applications . 2005
8王宏.超高层钢结构施工技术[M].北京:中国建筑工业出版社,2014.
9ChoiC K,Chung HK,Lee D G,et al.Simplified building analysis with sequential dead loads-CFM[J].Journal of Structural Engineering,ASCE,2012.
10Deke smith An introduction to building Information modeling(BlM)[J].Journal of Building Information Modeling(JBIM),2007.