摘要
对常州绿色动力环保热电有限公司3#垃圾焚烧炉2#机组大修效果进行评价,分别选取2个经济指标(锅炉产汽量、风机电耗)、1个技术指标(排烟温度)、1个安全指标(辅机振动值)进行分析。大修后锅炉产汽量比大修前增加77 t/d,折算吨蒸汽风机耗电量比大修前下降24%,锅炉排烟温度均值降低16℃,辅机振动值大幅降低。
The overhaul effect of 3# furnace 2# unit in Changzhou Green Power Environmental Thermal Power Co. Ltd. was evaluated. The 2 economic indicators (boiler steam production and fan power consumption) were analyzed respectively, as well as 1 technical indicator (exhaust gas temperature) and 1 security indicator (auxiliary vibration value). After overhaul, the boiler steam production increased 77 t/d and the convert tons of steam fan power consumption decreased 24% than before, the average value of flue gas temperature reduce more than 16 ~(3, auxiliary vibration value greatly reduced.
出处
《环境卫生工程》
2015年第6期22-24,共3页
Environmental Sanitation Engineering
关键词
垃圾焚烧
发电厂
大修
评价
waste incineration
power plant
overhaul
evaluation