摘要 苏州中心广场内圈购物中心钢结构主要包括中庭钢结构、大鸟屋面两部分,中庭结构位于运行中的地铁1号线正上方,大鸟形屋面结构横贯结构全部区域,覆盖整个中庭、南北区结构楼层上方。为满足钢结构施工需要,需安装塔式起重机,但塔式起重机拆卸过程工作量大,安全施工面临严峻考验,特别是在已完成钢结构上拆除塔式起重机是相当复杂的课题。主要介绍了复杂作业条件下塔式起重机拆除技术。 The shopping center in Suzhou Centre Square mainly includes the atrium steel structure and bird-shaped roof,and the atrium steel structure locates above the running metro line 1 and the birdshaped roof cover all of structure including the whole atrium and the south-north structure. To satisfy steel structure demand,tower crane need to be installed. But the amount of demolish of tower crane is big,so the construction safety control is difficult,especially above the finished steel structure. The paper mainly introduces demolishing of tower crane on complex working condition.
出处 《施工技术》 CAS 北大核心 2015年第22期41-43,共3页 Construction Technology
关键词 钢结构 塔式起重机 拆除 安全 steel structures tower cranes demolishing safety
  • 相关文献

参考文献6

二级参考文献16

  • 1江瑞虹.浅谈内爬塔吊高空拆除的施工管理[J].广东土木与建筑,2013,20(6):48-50. 被引量:5
  • 2王伟,周石磊,李一鸣.188m高空内爬塔式起重机拆卸关键技术[J].建筑机械化,2011,32(S2):37-40. 被引量:9
  • 3GB5144-2006塔式起重机安全规程[S].北京:中国标准出版社.2006.
  • 4建筑施工手册(4版)[M].北京:中国建筑工业出版社,2003.
  • 5GB/T13752--92塔式起重机设计规范[S].北京:中国标准出版社,1992.
  • 6上海市建工设计研究院有限公司,上海市第四建筑有限公司.JGJl96-2010建筑施工塔式起重机安装、使用、拆卸安全技术规程[S].北京:中国建筑工业出版社,20l0.
  • 7江苏省华建建设股份有限公司,江苏邗建集团有限公司.JGJ33-2012建筑机械使用安全技术规程[s].北京:中国建筑工业出版社,2012.
  • 8上海市建工设计研究院有限公司.JGJ-T189-2009建筑起重机械安全评估技术规程[S].北京:中国建筑工业出版社,2009.
  • 9沈阳建筑大学.JGJ276-2012建筑施工起重吊装工程安全技术规范[S].北京:中国建筑工业出版社,2012.
  • 10福建省工程建设质量安全协会建筑机械分会.DBJ-T13-67-2010建筑施工起重机械安全检测规程[S].福州,2010.

共引文献23

同被引文献4

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部