桐乡电厂基建工程建设过程中面临十分复杂的管理工作,投资方、设计院、施工单位、监理单位及各种设备材料供应商、调试单位以及有关地方行政管理部门,在整个工程建设过程中有密切的联系。电厂基建管理信息系统在体现这些关系的基础上,直接面向代表投资方进行建设管理的业主,面向参加建设工作的施工监理、设计监理及施工单位的管理人员。他们通过电厂基建管理信息系统的各子系统协同完成其业务工作,参与工程项目管理,达到提高工程建设质量、节约投资、节约人工统计成本、缩短工期,并快速实现竣工决算的目的,从而获得更高的经济效益。
In the entire construction process,the management work is very complex in the construction of Tongxiang Power Plant,investor,design institute,construction unit,supervision unit and all kinds of equipment and materials suppliers,commissioning units and the relevant local administrative departments,are closely linked.The power plant construction information system is based on these relations,directly facing the owners of the representative investors,construction supervision,design supervision and management personnel of the construction management.By using the various subsystems of power plant construction management information system,they coordinate finishing their work,participate in project management,promising to improve the quality of engineering construction,save investment,save the cost of labor statistics,shorten the time limit for a project,and achieve the purpose of the final accounts,so as to obtain higher economic benefits.
出处
《工业技术创新》
2015年第6期603-611,共9页
Industrial Technology Innovation
关键词
基建MIS
电厂建设
项目管理
竣工决算
The construction MIS
Power plant construction
Project management
Final accounts