摘要 Cemented paste backfill(CPB) is gaining popularity in many underground mines worldwide. Sufficient water is added into CPB to make a flowable material for pipe transportation. Barricades are built near the drawpoints to prevent in-rush of the fill slurry. To avoid barricade failures resulting from excessive backfill pressures, backfilling is typically performed with a plug pour followed by a final pour. The interval between the two pours should be shortened or removed to increase mining productivity and avoid pipe clogging. Recently, Li proposed to apply wick drains in backfilled stopes to promote drainage and consolidation. The preliminary simulations by considering an instantaneous filling indicated that the drainage of CPB can be significantly accelerated by using wick drains. Barricade was not considered.Here, some new numerical modellings are presented with more representative filling sequences, stope geometry, and different draining configurations. The results illustrate that the stope can be backfilled continuously by using wick drains. Cemented paste backfill (CPB) is gaining popularity in many underground mines worldwide. Sufficient water is added into CPB to make a flowable material for pipe transportation. Barricades are built near the drawpoints to prevent in-rush of the fill slurry. To avoid barricade failures resulting from excessive backfill pressures, backfilling is typically performed with a plug pour followed by a final pour. The interval between the two pours should be shortened or removed to increase mining productivity and avoid pipe clogging. Recently, Li proposed to apply wick drains in backfilled stopes to promote drainage and consolidation. The preliminary simulations by considering an instantaneous filling indicated that the drainage of CPB can be significantly accelerated by using wick drains. Barricade was not considered. Here, some new numerical modeUings are presented with more representative filling sequences, stope geometry, and different draining configurations. The results illustrate that the stope can be backfilled continuously by using wick drains.
机构地区 Department of Civil
出处 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2015年第6期897-904,共8页 矿业科学技术学报(英文版)
基金 the Natural Sciences and Engineering Research Council of Canada (RGPIN) the Institut de recherche Robert-Sauvé en santé et en sécurité du travail (IRSST) the industrial partners of the Research Institute on Mines and the Environment (RIME UQAT-Polytechnique)
关键词 胶结充填 回填 采场 数值 评价井 水泥浆 排水固结 应用 Mines Cemented paste backfill Backfilled stopes Numerical analyses Drainage Wick drains