摘要
文中结合某350 MW超临界机组正压直吹式制粉系统的技术特点及侧煤仓布置的实际情况,对矩形煤仓改为虾米形一体化原煤斗,解决了蓬煤堵煤问题,可为同类型煤场的类似的问题提供一定的借鉴。
In this paper,combined with a 350 MW supercritical units in positive pressure direct blowing pulverizing system technical characteristics and side bunker arrangement of the actual situation,of rectangular bunker is changed for shrimp integrated raw coal hoppers to solve the Peng coal blockage,can provide a reference for similar problems for the same type of coal.
出处
《应用能源技术》
2015年第12期21-23,共3页
Applied Energy Technology
关键词
原煤仓堵煤棚煤
技术改造
虾米形一体化原煤斗
Coal bunker coal
Coal plugging technology
Integration of small shrimp shaped coal hopper