深圳河治理工程规划思路及效益分析 被引量:5

Planning concept and benefit analysis of Shenzhen River Regulation Project
下载PDF
导出
摘要 深圳河是香港和深圳的界河,改革开放初期深圳侧常有洪水泛滥,地形低洼加上城市开发不当是主要原因。因此,深港两地开启了深圳河治理工程。工程分四期,前三期已于2006年完成。工程规划经历了被动应付灾害到以高标准指导治河的过程。尽管深圳河治理标准基本达到50年一遇,经济与社会效益显著,但由于土地开发、环境保护和行政约束等原因,深圳河要达到50年以上的标准仍然困难重重,主动改造深圳湾是主要的途径。 Shenzhen River is the boundary river between Shenzhen and Hongkong, of which flooding frequently occurred on the side of Shenzhen with the main causations of the low - lying land and the improper urban development therein during the initial reform and opening period. Therefore, Shenzhen River Regulation Project was started by both Shenzhen and Hongkong with four stages and the previous three stages were completed in 2006. The engineering planning of the project experiences a process from passively dealing with disaster to guiding the river regulation with high standards. Though the standards for Shenzhen River regulation basically reaches to a return period of 50 years with significant economic and social benefit, it is quite difficult to get the standards above the return period of 50 years for the river due to the causations of land development, environment protection, administrative restriction, etc. , thus the active improvement of Shenzhen Bay is just the main approach.
作者 林素彬
出处 《水利水电技术》 CSCD 北大核心 2015年第2期74-78,共5页 Water Resources and Hydropower Engineering
  • 相关文献

参考文献7

  • 1深圳市市区防洪工程指挥部.整治规划方案[R].深圳:深圳市市区防洪工程指挥部.
  • 2深圳市防洪联合治理小组.治理深圳河第一期工程计划报告书[R].深圳:深圳市防洪联合治理小组,1985.
  • 3深圳市罗湖区人民政府.深圳市罗湖区国民经济和社会发展第十一个五年总体规划(2006-2010年)[R].深圳:深圳市罗湖区人民政府,2006.
  • 4长江水利委员会,香港博威工程顾问有限公司.治理深圳河第三期第二阶段工程初步设计报告[R].武汉,香港,长沙水利委员会,香港博咸工程顾问有限公司,1999.
  • 5深圳市水务局.深圳市防洪(潮)规划报告(1994-2010)[R].深圳:深圳市水务局,1994.
  • 6长江水利委员会,香港博威工程顾问有限公司.深圳河河口改善及泥沙淤积规律研究最终报告书[R].武汉,香港,长沙水利委员会,香港博咸工程顾问有限公司,2009.
  • 7深圳市水务局.深圳市防洪潮规划修编及整治规划[R].深圳:深圳市水务局,2014.

同被引文献19

引证文献5

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部