锦屏二级水电站1#引水隧洞绿泥石片岩洞段处理技术与应用 被引量:6

Technology for treatment of chlorite schist section in No. 1 diversion tunnel of Jinping II Hydropower Station and its application
下载PDF
导出
摘要 针对锦屏二级水电站1#引水隧洞绿泥石片岩洞段施工期间出现塌方、围岩变形松弛、初期支护围岩变形收敛缓慢、普通水泥固结灌浆无法达到设计要求等技术难题,及时调整优化设计参数和施工方案,采取了二次扩挖、超前支护、加强系统支护、钢拱架支护、锚索支护、细水泥灌浆等综合工程措施,成功地解决了绿泥石片岩软岩洞段围岩抗变形稳定问题。 Aiming at the technical problems occurred during the construction of the chlorite schist section in No. 1 diversion tunnel of Jinping II Hydropower Station,such as collapse,deformation and relaxation of the surrounding rock,deformation and slow convergency of the initially supported surrounding rock,the conventional cement consolidation grouting that can not meet the relevant design requirement,etc.,the design parameters and the construction scheme are adjusted and optimized in time,i. e.the comprehensive engineering measures of the secondary enlarging excavation,advanced support,reinforced systematic support,steel arch support,anchor-cable support,fine cement grouting,etc. are taken,and then the problem from the ant-deformation stability of the soft rock—chlorite schist section in the tunnel is successfully solved.
出处 《水利水电技术》 CSCD 北大核心 2015年第4期87-92,共6页 Water Resources and Hydropower Engineering
关键词 引水隧洞 绿泥石片岩 开挖支护 细水泥灌浆 锦屏二级水电站 diversion tunnel chlorite schist excavation and support fine cement grouting Jinping II Hydropower Station
  • 相关文献

参考文献9

二级参考文献62

共引文献76

同被引文献61

引证文献6

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部