摘要
针对长江沿江大型泵站变频变速优化运行受潮汐影响的问题,提出了以泵站单机组耗电费用最少为目标函数的优化运行数学模型,考虑水量与机组功率约束,采用动态规划的方法,以江都四站为例进行计算,确定不同水量约束、不同日均扬程、不同日均潮差变幅条件下单纯长江潮汐变化对泵站单机组变频变速优化运行结果的影响。结果表明:随着日均扬程的降低、日均潮差的增大,沿江泵站变频变速优化运行效果愈加明显。
Aiming at the problem that the optimized variable speed operations of the large pumping stations along Yangtze River are impacted by the tidal variation,a mathematic model for the optimal operation that taking the least cost of the power consumption per pump unit as the objective function is proposed herein. Under the consideration of the constraints from both the water quantity and the power of pump unit,the impact only from the tidal variation of the river on the optimized variable speed operation of a single unit in pumping station under the conditions of variable constraints of water quantities,variable daily pumping lifts,variable daily mean amplitude of the tidal range is determined. The result shows that following with the decrease of the daily mean pumping lift and the increase of the tidal range,the effect of the optimized variable speed operation on the pumping stations along the river is more and more obvious.
出处
《水利水电技术》
CSCD
北大核心
2015年第4期96-99,共4页
Water Resources and Hydropower Engineering
基金
江苏省重点实验室开放课题"受潮汐影响的大型泵站站内优化运行若干问题的研究"资助(057387003k11020)
关键词
潮汐
泵站
变频变速
动态规划
优化
tide
pumping station
variable speed operation
dynamic programming
optimization