南水北调中线工程桥墩壅水特性研究 被引量:9

Study on backwater characteristics of bridge-piers of Mid-Route of South-to-North Water Diversion Project
下载PDF
导出
摘要 南水北调中线总干渠沿线设有阻水的槽墩、桥墩1145座,合理分析槽墩、桥墩的壅水大小,对于准确复核总干渠水面线、分析渠道输水能力具有十分重要的意义。本文利用Flow3D软件模拟了南水北调中线工程中常见的圆柱型桥墩的壅水特性,计算体型包括单排、双排和三排桥墩,桥墩的阻水比为5.0%-7.14%。分析表明,单排桥墩壅水的数值模拟结果与Yarnell修正公式计算结果相近;多排桥墩联合壅水值随桥墩排数的增加而增加。 As 1 145 aqueduct piers and bridge piers are there along the main channel of the Mid-Route of the South-to-North Wa- ter Diversion Project, it is quite important to reasonably analyze the magnitudes of the backwaters caused by aqueduct piers and bridge piers for correctly rechecking the water surface profile and analyzing the water conveyance capacity of the main chan- nel. The backwater characteristics of the normal column bridge piers of the mid-route of the project are simulated herein with the software of Flow3D, for which the types for the calculation include single row, double row and triple row piers with the water resistance ratios from 5.0% to 7.14%. The analysis shows that the result from the numerical simulation of the backwater of the single row pier is near that from the calculation made by the modified Yarnell formula, while the combined backwater value of the multi-row pier is increased along with the increase of the number of the pier rows.
出处 《水利水电技术》 CSCD 北大核心 2015年第11期121-125,共5页 Water Resources and Hydropower Engineering
关键词 南水北调中线工程 桥墩壅水 数值模拟 Flow3D Mid-Route of South-to-North Water Diversion Project backwater of bridge pier numerical simulation Fiow3D
  • 相关文献

参考文献19

  • 1J H Benn, P Mantz, H Lamb, et al. Nulluri. Afflux at bridges andculverts-Review of current knowledge and practice[ R]. Universityof Birmingham: R&D technical report, 2004.
  • 2Donald W Knight. Afflux at bridges and culverts, Review of currentknowledge and practice,Annex 1 : A review of current knowledge onbridge afflux[ R]. University of Birmingham: R&D technical report,2004.
  • 3MIKE 11. Reference Manual: A modeling system for river and channels[S].
  • 4Charbeneau R J, Holley E R. Backwater effects of bridge piers insuhcritical flow[ R]. University of Texas at Austin : Research Report,2001.
  • 5美国陆军T.程兵闭水力设计准则[S].
  • 6水力计算手册[M].北京:水利出版社,1980.
  • 7王开,傅旭东,王光谦.桥墩壅水的计算方法比较[J].南水北调与水利科技,2006,4(6):53-55. 被引量:54
  • 8Randall J. Charbeneau and Edward R. Holley. Backwater effects ofbridge piers in suhcritical flow [ H ]. University of Texas at Austin :Project summary report, 2001.
  • 9吴泽宇,蒋为群.南水北调中线工程输水渠道桥梁水头损失影响分析[J].水利水电快报,1997,18(15):1-4. 被引量:18
  • 10杨小亭,霍跃东,徐孝平.南水北调中线工程桥墩水力学试验研究[J].武汉水利电力大学学报,2000,33(6):16-19. 被引量:11

二级参考文献45

共引文献123

同被引文献98

引证文献9

二级引证文献55

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部