全覆盖条件下城市基坑支撑梁爆破拆除 被引量:3

Explosive Demolition of City Foundation Pit Support Beam under Full Covering
下载PDF
导出
摘要 南京市河西青奥公园工程基坑深10.25 m,面积28 300 m^2,采用钢筋混凝土梁支撑系统。为了安全快速地拆除6000 m^3的钢筋混凝土支撑梁,通过在支撑梁混凝土浇筑时预留爆破装药孔、孔内外延期起爆技术、钢管框架为主体的全覆盖防护措施等手段,达到了节省施工成本,增加工程经济效益的目的,取得了较好的爆破及振动控制、飞石和粉尘的防护效果,可为类似爆破工程提供参考。 The deep toundation pit project with reinforced concrete beam supporting system of Nanjing Hexi O- lympic Park is 10.25 m depth, and covers an area of 28 300 m2. In order to removed 6000 m3 reinforced concrete supporting beam quickly and safely, by adopting reserved blast hole scheme when pouring supporting beam concrete, delayed initiation technology of hole, full coverage measures by steel tubular frame, the blasting demolition was performed with small construction cost, meanwhile the preferable protective effects of the blasting vibration, fly rocks and dust were achieved,which provided a reference for the similar blasting engineering.
作者 杨建军 黄磊
出处 《爆破》 CSCD 北大核心 2015年第4期99-102,117,共5页 Blasting
关键词 预留爆破装药孔 孔内外延期 全覆盖防护 reserved blast hole delay in hole full cover protection
  • 相关文献

参考文献9

二级参考文献41

共引文献246

同被引文献25

引证文献3

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部