期刊文献+

陆军船艇建造进度监督程序

Procedure of Progress Monitor on Boat Building of Army
下载PDF
导出
摘要 针对当前陆军船艇建造进度计划不合理、要求不明确、制约手段缺乏等问题,提出按5个阶段进行监督的程序、内容和要求,并结合当前实际情况,提出拓展职责权限、完善经济性制约、建立协调机制、加强理论研究4项需要解决的问题。 Aiming at unreasonable planning,unclear requirements,absent restrictions and other issues about the progress of current boat building in the army,this paper brings out a 5-phase monitor procedure and relevant contents and requirements.In combing current conditions,the paper raises four problems to be solved out including expansion of responsibilities and authorities,completion of economic restriction,establishment of coordination mechanism and enhancement of theoretic study.
出处 《装备学院学报》 2015年第6期61-64,共4页 Journal of Equipment Academy
关键词 陆军 船艇建造 进度监督 监督模式 army boat building progress monitor mode of monitor
  • 相关文献

参考文献8

  • 1张明,巩秀.浅谈武器装备研制生产进度监督问题[J].装备指挥技术学院学报,2010,21(3):46-49. 被引量:2
  • 2刘小龙,席敬波,范庆.陆军船艇装备生产进度控制监督[J].车船军代表,2013(3):34-36.
  • 3张振敏.浅谈生产管理中的进度控制管理[J].东方企业文化,2013(2):95-95. 被引量:2
  • 4沈建明.国防高科技项目管理概论[M].北京:机械工业出版社,2008:93-94.
  • 5翟源景.装备采购项目管理[M].北京:国防工业出版社,2010.
  • 6装备研制过程质量监督要求:GJB3885A--2006[S/OL].[2010-03-26].http://www.bzfxw.com/soft/sort055/GJB/135126050.html.
  • 7装备生产过程质量监督要求:GJB5710--2006[S/OL].[2010-03-26].http://www.bzfxw.com/soft/sort055/GJB/135124944.htmi.
  • 8装备售后技术服务质量监督要求:GJB5707--2006[S/OL].[2011-12-18].http://www.dzbzw.com/down/12182011/66139.html.

二级参考文献8

  • 1张怀强 谢力.装备采办进度风险研究.海军装备,2006,(5):36-37.
  • 2李祖斌.寻求质量和进度的平衡点.装备,2002,(2):47-48.
  • 3刘玉营 陈兴安 赵斌.科研生产交叉情况下探求质量与进度的最优解.空军装备,2006,(5):46-48.
  • 4张永录 程融 陶杰武.浅议装备研制生产中质量与进度的关系.海军装备,2009,(12):34-35.
  • 5闫伟.建筑工程施工中进度控制和质量控制的作用与关系[M].
  • 6武然.浅谈进度控制和质量控制在施工中的作用与关系[M].
  • 7何丰.试论WBS分解结构在国际承包工程的应用[M].
  • 8陈昌.浅谈施工项目进度管理与计划调整[M].

共引文献4