地面预帷幕注浆止水技术在新建回风井中的应用 被引量:1

The Application of Surface Curtain Pre-Grouting Technology in New Return-air Well
下载PDF
导出
摘要 对新建回风井地面预注浆封堵地下水的设计方案、施工过程、堵水效果等进行了论述,工程实践表明,在矿区水文地质条件复杂的情况下,井筒开挖施工采用"下行式纯压注浆"地面预注浆技术,可有效隔断井筒与地下含水层之间的水力联系,为井筒开挖施工创造良好的条件,是治理矿区复杂含水层的有效技术方法之一。 Hydrological geological condition of newreturn-air well is complex, large amount of water gushing effecting shaft excavation is one of the major adverse factors. The design scheme of surface pre-grouting of the new return-air well in groundwater, construction process and water plugging effect are discussed in this paper. Engineering practice shows that the surface pre-grouting technology is one of the effective methods to control the complex aquifer in the mining area.
出处 《资源环境与工程》 2015年第6期986-990,1021,共6页 Resources Environment & Engineering
关键词 地面预注浆 帷幕注浆止水 回风井 surface pre-grouting water stop of curtain grouting, return-air well
  • 相关文献

参考文献5

  • 1胡飞,朱益明.新建回风井勘察报告[R].大冶:湖北省鄂东南地质大队,2012.
  • 2邝键政,昝日稳,王杰,等.岩土注浆理论与工程实例[M].北京:地质出版社,2006:1.
  • 3陈轲,王增光.地面注浆堵水技术在矿山建设中的应用[J].中国矿山工程,2009,38(1):36-40. 被引量:21
  • 4中国水电基础局有限公司.水工建筑物水泥灌浆施工技术规范: DL/T 5148-2012[S].北京:中国电力出版社,2012.
  • 5中华人民共和国国家技术监督局.矿区水文地质工程地质勘探规范:GB12719-1991[S].北京:中国标准出版社,1991.

二级参考文献2

共引文献22

同被引文献9

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部