期刊文献+

一种提高风电机组调度可靠性的风电场功率控制策略 被引量:4

POWER CONTROL STRATEGY OF WIND FARM THROUGH IMPROVING SCHEDULING RELIABILITY OF WIND TURBINE
下载PDF
导出
摘要 以提高风电机组调度可靠性为目标,提出一种考虑风电机组运行健康度的风电场功率优化调度策略。首先提出一种基于风电场数据采集与监视控制系统(SCADA)监测数据的风电机组健康状态评估策略,利用综合劣化度对机组的健康状况进行总体评估,为功率调度决策过程提供辅助依据。针对风电场实际运行中对机组启停以及功率控制的要求,结合机组健康度信息,建立风电场功率调度的复合目标多步优化模型,并设计基于遗传算法的求解策略。最后通过详细的算例验证了所提策略对改善运行风电机组的整体健康程度,优化机组的启停计划、提高风电场功率控制可靠性具有良好作用。 Improving the scheduling reliability of wind turbine was set as the goal, a simulation scheduling strategy of wind farm power was proposed based on considering operation health condition evaluation of wind turbine. Firstly, the evaluation strategy of operation health condition of wind turbine was proposed based on supervisory control and data acquisition (SCADA) system to monitor data, which adopted the comprehensive inferior degree to evaluate the unit' health condition. And the evaluation results provided the basis for the wind farm scheduling to provide auxiliary basis for the decision-making process. Secondly, concerning on the requirement of on-off switching state and power control in the wind turbine actual operation, and combining with the unit' healthy condition, a composite multi-step optimization model was established. Then a solution strategy was designed based on the genetic algorithm. Finally, the presented strategy was verified through the example for improving the overall operating health, optimizing the on-off schedule of the wind turbine and improving the power control reliability of wind farm.
作者 肖运启 孙芳
出处 《太阳能学报》 EI CAS CSCD 北大核心 2015年第12期2888-2894,共7页 Acta Energiae Solaris Sinica
基金 中央高校基本科研业务费专项资金(2015MS32) 国家自然科学基金(51207049)
关键词 风力发电 风电场 电网调度 状态评估 多目标优化 wind power generation wind farm grid schedule state evaluation multi-target optimization
  • 相关文献

参考文献12

  • 1GB/T19963-2011,风电场接人电力系统的技术规定[S].
  • 2Femandezai L M C, Garcia A, Jurado F. Comparative study on The performance of control systems for doubly fed induction generator wind turbines operating with power regulation[J]. Energy, 2008, 33(2): 1438- 1452.
  • 3黄崇鑫,张凯锋,戴先中,张冠虎.考虑DFIG机组容量限制的风电场功率分配方法[J].电力系统保护与控制,2010,38(21):202-207. 被引量:31
  • 4Cameron W P, Negnevitsky M. Very short-term wind forecasting for tasmanian power generation[J]. IEEE Transactions on Power Systems, 2006, 21 (2) : 965- 972.
  • 5Zhang Zhenzhen, Zhou Jianxiao, Zheng Guang. Ultra- short term wind power prediction model base onmodified grey model method for power control in windfarm [J]. Wind Engineering, 2011, 35 (1) : 55- 68.
  • 6Moyano C F, Lopes J A P. An optimization approach for wind turbines commitment and dispatch in a wind park [J]. Electric power Systems Research, 2009, 79 (1): 71-79.
  • 7Hameed Z, Hong Y S, Cho Y M, et al. Condition monitoring and fault detection of wind turbines and related algorithms: A review[J]. Renewable and Sustainable Energy Reviews, 2009.13( 1 ) : 1-39.
  • 8郭鹏,David Infield,杨锡运.风电机组齿轮箱温度趋势状态监测及分析方法[J].中国电机工程学报,2011,31(32):129-136. 被引量:122
  • 9郭鹏,徐明,白楠,马登昌.基于SCADA运行数据的风电机组塔架振动建模与监测[J].中国电机工程学报,2013,33(5):128-135. 被引量:60
  • 10张新燕,何山,张晓波,周培毅,王维庆.风力发电机组主要部件故障诊断研究[J].新疆大学学报(自然科学版),2009,26(2):140-144. 被引量:35

二级参考文献81

共引文献317

同被引文献26

引证文献4

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部