摘要
由于固贤500kV变电站处于500kV山西中部电网末端,运行条件较为苛刻,需要进行过电压研究。计算分析了启动调试方式和运行方式下的操作过电压、潜供电流、重合闸时间等,并针对运行要求提出推荐意见,以期为同类工程提供建设、启动调试及运行的参考意见。
Guxian 500 kV substation which is located in terminal part of middle Shanxi power grid requires overvoltage research.Consequently, the related system parameters of Guxian substation under startup commissioning mode and normal operation mode are calculated. According to the characteristics of the project, the recommendation opinions on startup commissioning and normal operation are given, in hope of providing reference for the same kind of project.
出处
《山西电力》
2015年第6期16-19,共4页
Shanxi Electric Power
关键词
工频过电压
潜供电流
操作过电压
power frequency over-voltage
secondary arc current
switching overvoltage