随着秦皇岛32-6油田及周边南堡35-2油田的开发,渤海世纪号FPSO上部模块水系统无法满足目前的生产需求,因此进行水系统扩容改造。本文结合渤海世纪号FPSO工艺模块水系统扩容改造工程实例,从基座设计、与原结构连接、结构加强等方面详细说明了FPSO上部模块改造结构设计中遇到的技术难点及解决方法,分析了FPSO模块改造结构设计特点,并简述了改造中需注意的问题,为FPSO模块改造结构设计提供借鉴和参考。
The water system of the upper module of BHSJ Floating Production Storage and Offloading(FPSO) cannot meet the current production demand with the development of QHD32-6 oil field and the peripheral NB35-2 oil field. Therefore, the water system should be modified to enlarge its capacity. The technical difficulties and the corresponding solutions encountered during the modification structural design of the upper module of BHSJ FPSO are introduced from the foundation design, connection to the former structure and structural reinforcement. Then, it analyzes the characteristics of the modification structural design, and summarizes the problems to be noticed during the modification, which can provide reference for the structural design of FPSO module modification.
出处
《船舶》
2015年第6期45-49,共5页
Ship & Boat
关键词
FPSO
上部模块
改造
结构设计
FPSO
upper module
modification
structural design