以太原市龙瑞苑项目施工测量放线为例,阐述了内控点布设的五要素,利用CAD绘图和楼层结构施工图,确立了该项目平面控制网测设方案,实践证明:该方案满足了结构实体的垂直度控制要求,提高了施工放线的效率。
Taking the measure line of Taiyuan Longruiyuan project construction as the example,this paper elaborated the five elements in interior controlling point setting,using CAD drawing and floor structure construction drawing,established the layout scheme of this project plane control network,the practice proved: the scheme could meet the perpendicularity control requirements of structure entity,improved the construction lining efficiency.
出处
《山西建筑》
2016年第1期221-222,共2页
Shanxi Architecture
关键词
测量放线
平面控制网
内控点
控制线
measure line
plane control network
interior controlling point
control line