摘要 大坝建基面的地质状况对水工建筑物的安全性及耐久性至关重要。月亮湾水库大坝开挖建基面揭示存在断层、裂隙及破碎带、粉细砂层等地质缺陷,有效解决坝基的变形速率不均匀和渗漏问题是坝基改良的关键。针对坝基的主要工程地质问题,采取清基、灌浆和置换处理等措施,使坝基岩体质量得到了显著改善。施工期变形监测成果显示,坝体沉降量由中部向两坝肩递减,相邻坝段差异沉降较小,大坝沉降趋于平缓。 Dam foundation engineering geological conditions are very important to the safety and durability of hydraulic structures. Fault,fissure and fracture zones,and silty sand layer were exposed in excavation of dam foundation of Yueliangwan Dam.The inhomogeneous deformation rate and seepage problems are the key to dam foundation treatment. According to the main engineering geological problems,measures like foundation cleaning,consolidation grouting and replacement treatment and so on were taken,which significantly improved the foundation rock mass quality. Deformation monitoring during construction period showed that the settlement decreases from the center of the dam to two abutments,the settlement differences of adjacent dam sections are relatively small,and the settlement of the dam tends to be stable.
出处 《人民长江》 北大核心 2015年第23期34-37,共4页 Yangtze River
基金 国家重点基础研究发展计划973项目(2011CB013505)
关键词 地质缺陷 基础处理 监测分析 混凝土面板堆石坝 geological defects foundation treatment monitoring and analysis CFRD
  • 相关文献

参考文献6

二级参考文献3

  • 1韩德福.简介Q系统、RMR岩体分级方法及在地下洞室围岩分级中的具体应用[J].水利水电工程地质情报网网刊,1987,:23-46.
  • 2黄润秋,澜沧江小湾水电站高拱坝坝基重大工程地质问题研究,1996年,146页
  • 3韩德福,水利水电工程地质情报网网刊,1987年,23页

共引文献38

同被引文献2

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部