摘要
阐述了实施快速掘进技术的必要性,详细分析了影响煤矿巷道掘进速度的因素,并提出了实现快速掘进的具体措施。
This paper expounds the necessity of the implementation of quick tunneling technology,analyzes the influence factors of coal mine tunneling rate,and puts forward some specific measures to realize fast excavation.
出处
《机械管理开发》
2015年第10期97-99,共3页
Mechanical Management and Development
关键词
煤矿
施工
掘进技术
coal mine
construction
tunneling technology