摘要
现代大型高炉设备紧密配合,衔接密切。协调地进行工作是考察炉顶装料设备和供料系统的性能的重要指标和基本要求。本文就铁厂2#高炉原地大修设备施工及其工艺流程.结合首钢水铜2#高炉设备大修施工,重点就炉顶设备施工进行了研究。
Facilities of modem large blast furnace closely match with each other. Harmonically working is an essential requirement for charging equipment at furnace top and charging system. This article mainly studies programs of equipment construction in autoehthonic overhaul of No.2 blast furnace and focuses on equipment construction at furnace top.
出处
《水钢科技》
2015年第4期9-13,共5页
Shuigang Science & Technology
关键词
高炉
炉顶设备
安装
调试
设备施工
blast furnace
equipment at furnace top
installation
debugging
equipment construction