摘要
介绍了鄂北地区水资源配置工程的基本情况,其生产性试验项目主要为5 km长的内径3 800 mm PCCP管道工程。论述了工程的施工条件、主要内容、施工工序和施工强度。
An introduction was made on the water resources allocation project in Northern Hubei province. Its pro- ductive experiment engineering mainly incorporates a PCCP pipeline of 5km long, with an inner diameter of 3800mm. The author presented the construction conditions, major components, construction procedures and intensity.
出处
《广西水利水电》
2015年第6期22-23,28,共3页
Guangxi Water Resources & Hydropower Engineering
关键词
鄂北地区
水资源配置工程
PCCP
施工组织设计
Northern Hubei province
water resources allocation project
PCCP
construction organization plan