层次分析法的海底隧道盾构施工风险评价 被引量:14

Evaluation of risks of shield construction of submarine tunnel with analytic hierarchy process
下载PDF
导出
摘要 针对台山核电站海底隧道泥水平衡盾构施工中要穿越不良地质体及地层结构界面的风险因素,利用模糊层次分析法对其进行辨识、分析、评价.结果表明在海底隧道盾构施工中,废弃物、孤石充填物力学指标不详、渗漏、换刀影响工期等危险有害因素对其影响较大,针对风险问题提出了有针对性的安全控制措施,保证了海底隧道安全顺利施工. There are a lot of risks in construction of tunnel of Taishan nuclear power crossing the bad geological body and stratigraphic structure interface. The key problems of risks of tunnel construction is to identify, analyze, evaluate and take measures. This paper calculated quantitatively of risk factors with analytic hierarchy process according to the construction characteristics of Taishan nuclear power tunnel. The MATLAB software was used in calculating for each risk factor relative to the overall goal of diversion tunnel construction risk assessment sorting weight. Through evaluation of risks of different construction phase, the safety of tunnel construction was ensured by adopting corresponding control measures.
出处 《辽宁工程技术大学学报(自然科学版)》 CAS 北大核心 2015年第11期1240-1243,共4页 Journal of Liaoning Technical University (Natural Science)
基金 国家"十二五"科技支撑计划重点项目(2011BAB05B03)
关键词 海底隧道 风险评价 层次分析 泥水平衡 盾构施工 submarine tunnel risk evaluation analytic hierarchy process slurry shield shield construction
  • 相关文献

参考文献10

二级参考文献47

共引文献113

同被引文献108

引证文献14

二级引证文献69

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部